
Facets of Indias Economy and Her Society Current State and Future Prospects Vol 2
Jha R.
₹9,250

Exact Methods for the Multi-Mode Case: 409
Springer-Verlag Berlin and Heidelberg GmbH & Co. K · 1994
Free delivery. Nothing extra to pay at checkout.
Resource-Constrained Project Scheduling: Exact Methods for the Multi-Mode Case: 409 by Arno Sprecher is a 142-page book published by Springer-Verlag Berlin and Heidelberg GmbH & Co. K in 1994. It belongs to the Lecture notes in economics and mathematical systems series.
Topics covered include Production scheduling and Production control.
About the author: Arno Sprecher (born 1962).